Stormwater: How to Prepare for and Perform a Sampling Project
The 2015 Multi-Section General Permit for stormwater is out. The previous 2008 MSGP expired in 2013, but was administratively continued until this year. The most significant changes in the 2015 MSGP include permit process streamlining, bolstering environmental...
Read full article